Frank L. Blum Construction has been selected as the Construction Manager @ Risk by NC State University and is seeking to prequalify construction trade and specialty contractors to submit bids to furnish labor, materials, equipment and tools for the Carmichael Addition & Renovation project in Raleigh, NC.
Description: The project will demolish the 47,000 GSF east wing, and replace it with an addition of approximately 82,800 GSF. Scope includes recreation, fitness and specialized activity space; classroom/multipurpose space; offices; and a functional training area. The project will create one controlled access point for the complex, make the second floor of the existing gymnasium building accessible, and install a sprinkler system and replace alarm systems throughout the entire complex. It will be a LEED silver certified building. This will be a phased project:
Package 1 - Demolition, Site Utilities, Grading, Foundations (Target bid date is May 2018)
Package 2 - Balance of Work (Target bid date is October 2018)
At this time we are accepting prequalifications from construction trade and specialty contractors for the following bid packages:
BP0100 - General Trades
BP0930 - Hard Tile
BP0174 - Final Cleaning
BP0950 – Acoustical Ceilings
BP0240 - Building Demolition & Abatement
BP0960 - Resilient Flooring, Carpet & Base
BP0300 - Turnkey Concrete
BP0990 - Painting
BP0400 - Turnkey Masonry
BP1000 - Specialties & Accessories
BP0500 - Turnkey Steel
BP1014 - Signage
BP0622 – Millwork
BP1165 – Climbing & Bouldering Walls
BP0742 – Metal Wall Panels
BP1220 - Window Treatments
BP0750 - Roofing
BP1420 - Conveying Systems
BP0781 - Fireproofing
BP2100 - Fire Protection
BP0790 – Caulking & Waterproofing
BP2200 - Plumbing
BP0810 - Doors, Frames & Hardware
BP2300 - HVAC
BP0833 – Coiling Doors & Grilles
BP2600 - Electrical
BP0840 - Storefront/Curtainwall
BP3100 - Sitework & Site Utilities
BP0860 – Skylights
BP3163 – Aggregate Piers
BP0920 – Gypsum Board Assemblies
BP3214 - Hardscapes
BP0925 - Gypsum Board Assemblies & ACT Combo
Additional packages may be added or deleted by the Owner and Construction Manager.
Frank L. Blum Construction has a long-standing commitment to maximize minority and other HUB participation on all of our projects. Our goal is to achieve a minimum of 20% minority participation on this project.
Forms can be obtained from Blum’s online plan room http://www.flblum.com/subcontractors.php.
Completed prequalification forms should be submitted to Jen Patten by March 16, 2018 via email (jpatten@flblum.com) or mail (4020 Westchase Blvd, Suite 450, Raleigh, NC 27607).
Plans will not be issued to any contractor until prequalification form is submitted and approved by the Committee.